|
Place of Origin | China |
Brand Name | JT-RESIN |
Certification | SGS,CE,UL |
Model Number | JT 8229 |
clear liquid factory current transformer 12kv 24kv 48kv indoor epoxy resin
Electrical Insulation Materials:
| ||||||||
JT 8229A/JT8229B is epoxy resin system formulated for indoor electrical insulator parts, medium to high voltage insulation parts, like SF6 | Summary | |||||||
Excellent mechanical and electrical performance Properties | ||||||||
For medium and high voltage indoor electrical insulator parts, such as Application Post insulator, circuit breaker, switch block, bushing and Mechanical components
| ||||||||
Hubei Jiangte Insulation Composite Guangzhou Jiangte Insulation Composite Add:No.219,Zhanghua Rd(N),Economic & Development Add:Rm606,DongHong International Plaza, No. Zone of Qianjiang City, Hubei Province, China. 113, Chebei Rd, Tianhe District, Guangzhou,China. Tel:+86-728-6201068 Tel:+86-20-82320316 Fax:+86-728-6202066 Fax:+86-20-82315407
| ||||||||
| ||||||||
JT 8229 A Prefilled, Liquid, Specially formulated Epoxy Resin | ||||||||
JT 8229 B Prefilled, Liquid, Curing agent
Epoxy coating powder JT105 can be a useful material for electrical insulation of wire and busbars, as well as high performance motors. Here are some features and benefits of JT105 epoxy coating powder: |
Mechanical and Physical Properties (guideline value) | ||||||
Special Tips
The effective pot life is about 2-3days(≤25°C). Cleaning mixing bowl each week or cleaning after work. Pipe with mixture and gauging device must be cooled/cleaned to avoid sedimentation or increased viscosity. Stopped on weekend, no need to clean pipe.
For various viscosity data under different temperatures, please refer to figure: 4.1, 4.2 and 4.4
Mould temperature APG process 130 - 160°C Conventional vacuum casting 70 - 100°C
Demould time(depends on mould temperature and casting volume) APG process 10-40 min Conventional vacuum casting 4-8h
Curing condition APG process(the shortest curing time) 4h@140°C Conventional vacuum casting 8h@130°C
It is necessary to test spicemen or measure glass transition temperature to judge its final performance good or not Different gel time and curing procedure during operation may result in different cross linking and glass transition Temperature.
Process(Guideline values) | ||||||
Tested system: JT8229A/B Mixing Ratio: 100/100 | ||||||
First aid
When the eyes by resin and curing agent and the contamination of castable, immediately with a clean, running water rinse 10 to 15 minutes. To see a doctor. Touch or splash on the skin material to erase, and then clean with water pollution areas (see above). If severe pain or burn, want to see a doctor. Dirty clothes to replaced immediately.
Discomfort caused by inhalation of vapors, want instantly remove outdoor. If in doubt, please inquire the medical help.
Contact Us at Any Time